About
Services
Our Work
Subcontractors / Suppliers
Careers
Contact
Select Page
Our Work
Project Type
All Project Types
Bridges & Infrastructure
- New
- Rehab
- Water & Waste
Commercial
- Financial
- Offices
- Other
- Restaurants
- Retail
Current
Featured
Industrial
Institutional
Multi-Family/Residential
Oil & Gas
Specialty
Sports & Entertainment
Sustainable
Services
All Services
Design-Build
Construction Management
Design-Bid-Build
Public Private Partnership (P3)
Cost Plus
General Contractor
Project Management
Property Development
Specialized Construction Products
Sustainable Solutions
Value Engineering
Charleswood Bridge and Related Works
Swan Lake First Nation Water Treatment Plant, Carberry MB
CP Rail Structural Roof Beam Repairs
Tobacco Creek Bridge
Sulphur Spring Timber Bridge Rehabilitation
Suction & Discharge Manifolding, TransCanada Pipelines
Strecker Bridge Replacement
St Andrews Lock & Dam Rehabilitation
Scott & Bryson Drains Timber Bridge Rehabilitation
Redwood Bridge Splash Pads and Deck Drains
PTH 59 & 100 Overpass Rehabilitation
Norwood Bridge Deck Overlay
North End Water Pollution Control Centre
New Gold Mine, Rainy River ON
Little Souris River Bridge
Lenchuk Creek Open Bottom Culvert
Lake Interconnection Culvert Crossings
Winnipeg Beach Harbour Rehabilitation
GWWD Mile 22.15 and 41.3 Bridges
Grand Rapids Bridge Rehabilitation
Elm Park Pedestrian Bridge Concrete Pier Rehabilitation
East Favel Bridge & Approach Roadworks
Dugald Road Overpass Rehabilitation
Donald Road Lift Station
Culvert Replacements, RM of Stanley
CP Rail WWTP Base Building
CP Rail Overpass Bridge, East Perimeter
CP Rail McPhillips Street Underpass Repairs
CP Rail Main Street Underpass Rehabilitation
CP Rail Main Street Overpass Bridge Deck Waterproofing
CP Rail Kenora Bridge Waterproofing
CP Rail Kenora Bridge Rehabilitation
CP Rail Clandeboye Timber Pile Bridge Reconstruction
Concrete Box Culverts
CN Harte Road Overpass
Chief Peguis Trail Pedestrian Bridge
Bridge over the Plum River
Bridge over Netley Creek
Blackburn Bridge Replacement over Edwards Creek
Assiniboine River Diversion Bridge Modifications
Assiniboine River Bridge Substructure Strengthening
Assiniboine Park Pedestrian Bridge Rehabilitation
Shoal Lake Pumping Station
Provencher Bridge Deck Repairs
Kildonan Bridge Seal Replacement
Conway Outfall Gate Chamber
City of Winnipeg Valve Chamber
Long Plains First Nations Infrastructure Project