Little Souris River Bridge
As the successful bidder, Ernst Hansch Construction Ltd. was awarded the Manitoba Infrastructure contract for the construction of a new 36 metre, 3 span precast concrete bridge over the Little Souris River on PR348 in the Rural Municipality of Whitehead. Construction was completed over a 3 month period during the winter.