CP Rail Overpass Bridge, East Perimeter
Ernst Hansch Construction Ltd. was awarded the Manitoba Infrastructure contract to construct a three span precast prestressed concrete box girder bridge over the CPR rail line on the east perimeter, over PTH 101. The contract included all labour and equipment to erect the bridge with the supply of materials provided by the Manitoba Department of Highways and Transportation. The project schedule included coordination between Ernst Hansch Construction Ltd. and CPR to work around their train schedule.